One process, or eleven?
You have grown by acquisition, or opened sites one at a time, and every plant now runs its own version of the same process. Group reporting no longer reconciles. An audit is coming. Nobody has the eighteen weeks it would take to map what each site actually does.












How we harmonise
MAP BEFORE YOU STANDARDISE
Everyone knows the sites differ. Almost nobody can say where, and a blueprint written without that evidence gets ignored at the second site.
OWNERS, KPIS AND A REVIEW DATE
One way to work means all three. Without them it is a slide, and slides do not survive the next reorganisation.
WE DO NOT RUN THE ROLLOUT
We build the blueprint, the playbook and the governance, we pilot it, and then your PMO owns it.
Where the weeks actually go
Bar widths are to scale. Half the sprint is spent inside your sites.
Scope
Agree which process, which sites, and what one way of working actually has to cover.
Process and sites agreedMap
Site interviews and walkthroughs to find where the versions really diverge, not where people believe they do.
Interviews and walkthroughs at every siteHand over
The blueprint, the playbook, named owners, KPIs and a review date. Piloted at one site before we leave.
Blueprint handed over, yours to runTwo hours of your team’s time a week. No workshop marathon.
Questions we have answered
Which of our sites is actually running this process the best way?
Why does group reporting stop reconciling when every site says it follows the standard?
What would an audit find at our weakest site?
Which differences between sites are real constraints, and which are just habit?
Who owns this process after the project team disbands?
What happens to the blueprint at the second site?
Where multi-site standardisation actually stalls
A three part argument built from three separate standardisation mandates. Part one is a map nobody had. Part two is a bill nobody had added up. Part three is variation that is not in your process at all. Every figure traces to a published case, and each piece says plainly what it could not settle.
Quick reads
Operational improvement work we have published. Time and activity, safety standards, maintenance and improvement culture.
Case studyUnlocking Efficiency in Plant Supervisor Operations
Read it →
Case studyStandardizing Fleet Maintenance and Control Operations
Read it →
Case studyReducing Out-of-Box Failures in Delivery Operations
Read it →
Case studyStandardizing Maintenance for Factory Reliability
Read it →
Case studyStandardising Continuous Improvement Across Sites
Read it →
Case studyUnifying Risk Assessment and Safety Processes
Read it →
Case studyBuilding a Unified Supply Chain Process Framework
Read it →
Case studyOptimizing Warehouse Replenishment Efficiency
Read it →
Case studyOptimizing Value in Integrated Sawmill Setup
Read it →Quick reads
Standardisation work we have published. Process mapping, blueprints, playbooks and the governance that makes one way of working stick.
Case studyBuilding a Unified Supply Chain Process Framework
Read it →
Case studyStandardizing Supplier Quality Workflows Across Sites
Read it →
Case studyStandardizing Fleet Maintenance and Control Operations
Read it →
Case studyStandardizing Financial Services Across Business Areas
Read it →
Case studyBuilding a Unified Mill Services Catalogue
Read it →
Case studyStandardising Continuous Improvement Across Sites
Read it →
Case studyUnifying Risk Assessment and Safety Processes
Read it →
Case studyStreamlining Global Audit Framework
Read it →
Case studyStandardizing Maintenance for Factory Reliability
Read it →What standardisation sprints have returned
A €10B global pulp and paper company with quality workflows written differently at every mill. 3 countries analysed, 30+ interviews. Annual losses identified across four mills.
A €11B global forest and paper company with no single view of who does what. A transparent service catalogue built from 300+ services, 10% of it identified as outsourcing potential.
A €1B Nordic food company running the same supply chain process nine ways. A 4-level process map and 18 interviews, with defined roles and KPIs behind the improvement.
A €1.5B logistics company standardising maintenance and control across terminals. 30+ stakeholder interviews. Concrete levers identified, not yet banked.
A €3B global chemical company with continuous improvement run differently in every country. 40+ interviews across 16 countries, and one standardised funnel behind the tracking.
A €19B global energy company auditing the same things twice. 20+ internal interviews. Redundant activity identified for merging or elimination.
Hear from Our Customers
“The work of the team was important in increasing the level of awareness and urgency on the selected subject internally.”
€30B global electrification and automation group
“I have to say that from quality perspective team exceeded all targets. Fast, intense – “Sprint Manner” way of working showed well its power.”
€3B global chemical company
“I have completed 23 years in the industry and I’m not that easily impressed but I must say astonished by the result you have here.”
€10B global industrial technology group
Bring us the process that eleven sites do eleven ways.
If nobody in the room can say where the sites actually differ, that is the sprint. Eight to ten weeks, one senior analyst and two juniors, and the blueprint, the playbook and the governance are yours at the end.
Talk to us →

