“SprintlyWorks helped us cut through a complex material landscape and quickly identify which sustainable alternatives were worth serious consideration”
Everyone could say no and nobody could say yes
The alternatives existed. A basis for comparing them did not.
An 8 to 10 week sprint, from July 2025. A European building products company of around €500M revenue. A standalone piece, not part of a series.
The company makes sandwich panels: two metal faces bonded to an insulating core, used for the walls and roofs of industrial buildings. The core is the product. It is what insulates, and it is what determines how the panel behaves in a fire.
Both cores in use, PIR (polyisocyanurate foam) and mineral wool, are carbon-intensive, and both face rising regulatory and customer pressure for sustainable alternatives. That pressure is the operating condition the product now sits in, not a forecast about one.
Three things stopped the company acting: gaps in technical performance data, inconsistent fire-resistance data, and few proven bio-based options. Standing still carried its own cost. High production costs, scarce market-ready solutions and heavy R&D requirements delayed adoption and put share at risk in the growing low-carbon construction segment.
The shape of the problem matters. The company was not waiting for a material to be invented. Candidates existed. It was waiting for a reason to prefer one, and that reason never arrived.
Four tests, four owners, and nobody holding all four at once
Nobody at this company needed to be told about insulation. They make panels for a living. R&D knows the chemistry, production knows what the line will run, regulatory knows the fire standards, and the commercial team knows what a building specifier will sign off.
That expertise is the problem. The work had to clear four feasibility tests: technical, operational, economic and sustainability. Each test sits with a different function, and each function can disqualify a material on its own.
R&D rejects on performance. Production rejects on the line. Finance rejects on cost. Regulatory rejects on fire. None of them can approve, because approval means clearing all four, and clearing all four is nobody’s remit.
So the evaluation never failed. It stalled. Each function tested whichever candidates reached it, against its own threshold, at whatever pace its year allowed. One material cleared a gate in March, another cleared a different gate in June, and no single document ever held them side by side.
Fire resistance bit hardest. The data on it was inconsistent, and for a panel in a building, fire performance is the test that disqualifies outright. Inconsistent data left every candidate simultaneously alive and dead, which is the most expensive state a shortlist can occupy.
Then there is the scale of the work. Thirteen candidate materials against four tests is 52 assessments, every one held to the same definition, on top of 20+ internal interviews to establish what each function’s threshold actually is. That is a full-time job for a team, and it is precisely the work that does not fit around a product range shipping this year. We ran it in 8 to 10 weeks with dedicated people.
Ask what would make you say no, before looking at a single material
Identify and assess the alternatives
Bio-based, recycled and recyclable cores capable of replacing or reducing PIR and mineral wool. Breadth first, because a shortlist drawn early contains only the candidates somebody had already heard of.
Evaluate them on one set of tests
Technical, operational, economic and sustainability feasibility, applied to all thirteen candidates by one team at one time.
Recommend adoption pathways
Routes into the product portfolio, and what a pilot would have to demonstrate before a material takes one.
The 20+ internal interviews came first. Every one of them asked the same two questions: what does this function need a core to do, and what would make it reject one. Written down, four private standards held in four heads become one specification. Benchmarking 13 materials comes after that, because only then is there something to benchmark against.
Thirteen candidates, four that survive every test, three ways to adopt one
A benchmark across 13 materials
Every candidate held to the same technical, operational, economic and sustainability criteria. That common basis is what makes it a benchmark rather than thirteen separate write-ups.
Four viable alternatives
Core materials capable of replacing or reducing PIR and mineral wool usage, surfaced by the research and confirmed by the benchmarking.
Three adoption pathways
Routes for bringing a sustainable core into the product portfolio, so the next decision is which route to take rather than whether to take one.
A carbon figure attached to the shortlist
Switching to the shortlisted bio-based and recycled cores could cut emissions from panel core production by up to 40%.
Four private standards became one specification, and thirteen candidates became four
| Before the sprint | After the handover |
|---|---|
| Four feasibility tests, each applied by a different function at its own pace | One set of criteria applied to every candidate in the same document |
| Fire-resistance data inconsistent, so nothing could be ruled in or out | Every candidate assessed on a comparable fire-performance basis |
| A long list of alternatives nobody had compared | Four viable alternatives out of the thirteen |
| Sustainability argued as an ambition | 40% potential cut in core-production emissions, attached to a named shortlist |
What that enables. The next conversation is which of three pathways to pilot, not whether a bio-based core is worth investigating at all. That is a shorter agenda, and it ends in a decision.
Pilot one pathway, and keep the criteria alive
Pilot, rather than evaluate a fourteenth material
Thirteen were benchmarked and four survived. More candidates will not settle what only a pilot settles: whether the line runs it, and whether a specifier accepts it.
Give the four criteria an owner
Written down and applied consistently, they are the most reusable output of the engagement and the easiest thing to lose. Without somebody attached to them they revert to four private standards inside a year.
Put the next benchmark in the calendar
Market-ready solutions were scarce when we ran this, and the supply base moves faster than anything else in this picture. Set a date to re-run it. A benchmark built once describes a market that has already moved.
No material was adopted and no pathway was piloted
No material was adopted. Four viable alternatives were identified and three pathways defined. No pathway was piloted, and no panel was made with a new core during the sprint.
The 40% is potential. It is a modelled consequence of a decision the company had not yet taken, and it applies to panel core production, not to a finished panel and not to the company.
Fire performance was assessed, not certified. The sprint produced a comparable view of where each candidate stands. Certification is granted by a third party against a published standard, and the underlying test data sits with the client and is confidential.
Source. All figures come from the SprintlyWorks engagement record for Bio-Based Solutions for Panel Insulation, a European building products company of around €500M revenue: 20+ internal interviews, 13 materials benchmarked, 4 viable alternatives identified, 3 feasible strategies defined, and a 40% potential carbon footprint reduction. The quote comes from its Head of Product and Services. We describe clients without naming them, and the four shortlisted materials, their suppliers and the customers who would receive them do not appear here.
Tell us the question nobody has the bandwidth to answer
We run 8 to 10 week sprints for industrial companies that have a decision to take and no spare team to take it with. You get named people, a defined question, and the evidence in your hands at handover.
If an evaluation in your business has been running for more than a year without a decision, stop asking which option is best and ask this instead. Which function is allowed to say yes, and against what? If the honest answer is nobody and nothing, more research will not end it.
Tell us the question. We will tell you whether a sprint can answer it, what it would take, and what you would hold at the end. If a sprint is the wrong tool, we will say so. Write to rahul.abhisek@sprintlyworks.com.
Have a similar requirement?
Contact us today to learn more about on-demand workforce and accelerate development on your most pivotal projects!
Featured Case Studies
Strategy & Commercial ExcellenceA sales force cannot survey a market it does not serve
25 September 2026Read ›
Strategy & Commercial ExcellenceMap the flow before you move the fleet
25 September 2026Read ›
Strategy & Commercial ExcellenceThe biggest research budget was not the most inventive
28 August 2026Read ›Accelerating Success for Enterprises in 20+ Geographies

Launch Your Sprint with
Download the full report
Enter your email to access this exclusive case study.
