Mining and pulp and paper customers were pushing to become digital mines and digital mills, which changes what they need from their supplier software. One of the client own digital leads put the problem in a sentence: user experience knowledge inside the company is very low. The evidence that mattered was not an opinion. Operators were logging in ten times, across products bought from the same supplier, to run one plant.

10
Separate logins reported to operate one site
11
Interviews across customers, product and digital leads
7
Digital products assessed against user needs
15 days
Training reported before one core platform is usable
A note on sourcing. Every figure here comes from a SprintlyWorks client engagement. Clients are described, never named. Where a figure is identified, modelled or indicative rather than banked, the line says so.
01

What the customers were actually doing

The most telling findings were behavioural rather than stated. Customers were exporting data out of the supplier tools into spreadsheets, building charts by hand, and drawing their insight there. A maintenance executive described people who had stopped looking at alarms altogether because there were too many of them, and who wanted one root cause instead.

And the logins. Monitoring, motors and drives all carried separate dashboards, so operators signed in repeatedly through a working day. The question the customers asked back was the obvious one. If these are all your solutions, why can we not log in once.

None of that is a feature request. It is a set of workarounds, and workarounds are what a user builds when the product has stopped being worth arguing with.

02

The cost sits in training, and the customer pays it

One core platform was reported to take around fifteen days of training plus remote assistance before it was usable. The same platform is highly configurable, which customers named as both the strength and the reason the training is unavoidable, because almost nothing arrives preconfigured.

On another product, a customer service delivery team was reported to need over six months of learning time, with mistakes made on the job in between. Both figures come from interviewees rather than from measurement, and they are single source, so they are indicative rather than established.

Two products were described by users as visually obsolete, in language comparing them to desktop software from the mid nineties. A third was praised for its calculation engine and criticised for presenting the result badly, which is the clearest possible statement that the engineering was never the problem.

03

Four trends, five requirements

The interviews were reduced to four digitalisation trends, next generation analytics, a digital workforce, automation, and the convergence of information and operational technology. Each maps to a user experience requirement the supplier is not currently meeting: data visualisation, mobility, preconfiguration and customisability, cybersecurity, and a consistent experience across products.

The supporting evidence is third party and should be read that way. Process manufacturers were estimated to capture only 20 to 30 per cent of the potential value of data analytics where visualisation is absent. Connected workers were expected to contribute up to 85 million dollars of productivity gain in mining and metals. Automation was projected to remove up to 4 per cent of the total cost base in pulp and paper. All three are industry projections, none is a client measurement.

Cybersecurity turned out to be a purchasing criterion rather than a technical one. These customers treat operational knowledge as competitive advantage, so where the data sits decides whether they buy.

Mapping

What each trend demands of the interface

Four digitalisation trends identified from eleven interviews, each mapped to the user requirement it creates. The supporting figures are third party projections, not client results.

TrendUser requirement it createsEvidence cited
Next generation analyticsData visualisationProcess manufacturers capture only 20 to 30% of analytics value without it
Digital workforceMobilityUp to $85 million of productivity gain expected in mining and metals
AutomationPreconfiguration and customisabilityUp to 4% of total cost base in pulp and paper, projected
Technology convergenceCybersecurity and one consistent experienceLower cost of ownership through standardisation
How to read this → The right hand column is the reason the middle column matters to a buyer. It is not evidence that the supplier had improved anything.
SprintlyWorks analysis
04

Why it had stayed this way

The root causes were internal and they were stated without softening. There were no user experience specialists at business unit level. User experience was not on the product development agenda. Design guidelines existed and were adopted voluntarily, which makes performance against them unmanageable.

One digital lead said communication was very poor and that they had never spoken to the design team. The consequence showed up as duplicated build: two business units had each produced a condition monitoring tool, and neither knew the other existed.

There was also a hard platform constraint. Several products are tightly coupled to a base automation system, so one of them cannot be redesigned on its own. Fixing the interface on a single product is not available as an option, which rules out the cheap answer.

Diagnosis

Three root causes, and what each one costs

Why a company with strong engineering was shipping interfaces its own customers worked around.

Root causeWhat it looks likeWhat it costs
No collaboration across unitsDesign team and product teams in different countries barely speakThe same tool built twice by two units that did not know
Platform constraint designProducts tightly coupled to one base automation systemNo single product can be fixed on its own
Varying delivery processSome units carry no design capability and hire agencies per projectA different experience in every product a customer buys
How to read this → None of these is fixed by a redesign. All three are fixed by changing who is in the room when a product is specified.
SprintlyWorks analysis
05

The recommendation was not a redesign

A redesign would have been the expected deliverable and it would have been the wrong one, because the same interface would have come back on the next product. The recommendation was a four stage capability build instead.

First, get design into the product development process and make the case internally that it is a purchasing criterion for customers, not a finish. Second, build design capability inside each business unit and involve designers with customers early. Third, create the mechanism for units to share what they know, since they currently operate independently and have no incentive to. Fourth, put user experience into the company own stage gate model and track it with measures, so it is managed rather than encouraged.

That is a slower answer than a redesign and it is the only one that holds.

06

What this study can and cannot carry

Eleven interviews, of which two were customers. That is a thin customer base and it is stated here for the same reason it was stated in the deck. The five requirements are identified from those interviews, not validated by market research, and any claim built on them has to keep that word.

There is no measured result in this engagement. No product was redesigned, no capability was built and no improvement was recorded during the work. What it produced was a diagnosis specific enough to act on and a sequence that starts with the cheapest step.

Download the full case study

Have a similar requirement?

Contact us today to learn more about on-demand workforce and accelerate development on your most pivotal projects!

Quick Reads for Big Impact

Accelerating Success for Enterprises in 20+ Geographies

Launch Your Sprint with

Define your project, connect with top-tier consultants, and start making progress fast.

Not advice. Analysts.

© 2026 All rights reserved. Business ID: 3096416-9
rahul.abhisek@sprintlyworks.com | Mannerheiminaukio 1a, 00100 Helsinki

Augmented Team of Business Analysts to Boost Capacity & Capability

Featured In

© 2025 All rights reserved

Stay in the loop

Talk to us